Question1: Which is a minimum requirement for applying the change theme?
Question2: Identify the missing words in the following sentence. A Project Manager agrees the [ ? ] with a Team Manager.
Question3: Which is a benefit of applying the 'tailor to suit the project' principle?
Question4: Which may be funded from a risk budget?
Question5: Which of the following is NOT an event-driven control?
Question6: Which statement about stages is true?
Question7: Which is a purpose of a Risk Register?
Question8: Which is a purpose of a Risk Register?
Question9: Which theme defines the accountability for realization of the project's benefits?
Question10: What theme provides the justification for the project?
Question11: From whom does a Team Manager obtain approval for a completed product?
Question12: What product is used to maintain a record of those who have an interest in the project and their information requirements?
Question13: If the Project Board instructs the Project Manager to implement a request for change, which document would contain details of that change?
Question14: Which is assumed to be a customer's responsibility in the PRINCE2 customer/supplier environment?
Question15: When considering how long the project stages should be, which might be a reason for one stage to be longer than others?
Question16: Which is an objective of the 'starting up a project' process?
Question17: Which is a purpose of a project brief?
Question18: Which describes risk probability?
Question19: Which is a purpose of the Initiating a Project process?
Question20: Which process is used to define how baselines will be established and controlled?
Question21: When considering how long the project stages should be, which might be a reason for one stage to be longer than others?
Question22: Who should use the information in a Lessons Report to refine, change and improve the standards within a quality management system?
Question23: During the Managing a Stage Boundary process, what is reviewed and updated to provide the information needed by the Project Board for assessing the continuing viability of the project?
Question24: Which statement applies to Stage Plans?
Question25: Which is an objective of the Managing Product Delivery process?
Question26: Which theme addresses the need to have a strategy for communicating with stakeholders?
Question27: Which is a responsibility of the managing level within the project management team?
Question28: Which is a typical core activity within configuration management?
Question29: When tailoring PRINCE2 to suit the project, [?] may be changed to suit other standards or policies.
Question30: Which role is responsible for the quality of the specialist products delivered in the project?
Question31: Which is a purpose of the Controlling a Stage process?
Question32: Which is an objective of the Directing a Project process?
Question33: What theme provides all management levels within the project management team with mechanisms for monitoring and control?
Question34: In a commercial environment, which process links the team manager and the PRINCE2 method used in a project?
Question35: Which describes risk appetite?
Question36: Which is a minimum requirement for applying the quality theme?
Question37: Identify the missing words in the following sentence.
When planning the next stage, the Project Manager needs to review and, if necessary, update the [ ? ] with regard to external resources or suppliers.
Question38: Which is NOT one of the PRINCE2 integrated elements?
Question39: Which statement defines a risk?
Question40: If a project's benefit tolerance is forecast to be exceeded, to whom should this be escalated to for a decision?
Question41: Which is a type of issue?
Question42: Identify the missing words in the following sentence.
The 'directing a project' process starts when [ ? ] and is triggered by the request to initiate a project.
Question43: Identify the missing words in the following sentence.
The role of [ ? ] is assigned to the project manager if it is not allocated to another person.
Question44: Which is a true statement about time-driven controls?
Question45: Whose approval is needed to replace a Stage Plan with an Exception Plan?
Question46: Which is a purpose of a project brief?
Question47: Which of the following can be done to control the size of the Project Board on a project that involves multiple users and suppliers?
Question48: Which is one of the six aspects of project performance to be managed?
Question49: Which is a benefit of using PRINCE2?
Question50: Identify the missing words in the following sentence. A purpose of the Plans theme is to [ ? ] the project's plans.
Question51: Which should be provided by a project mandate?
Question52: According to PRINCE2, which characteristic is necessary for an effective project board?
Question53: From whom does a Team Manager obtain approval for a completed product?
Question54: Which is a purpose of the Quality theme?
Question55: Identify the missing word in the following sentence. A member of the Project Board is responsible for [ ? ] assurance.
Question56: Which of the following statements about the Closing a Project process are true?
1. The Closing a Project process provides a fixed point for the receipt of completed Work Packages for the work performed in the final stage.
2. The Closing a Project process provides a fixed point to review if the objectives set out in the original Project Initiation Documentation have been achieved.
Question57: Which process provides information for the project board to review a completed stage and confirm continued business justification?
Question58: Which is a minimum requirement for applying the organization theme?
Question59: Which statement defines a risk?
Question60: Which describes a project benefit?
Question61: Which statement about time-driven controls is CORRECT?
Question62: Which control must be used as a minimum requirement for applying the 'progress' theme?
Question63: If a project is part of a programme, which 'starting up a project' process activities are MOST likely to be reduced or eliminated?
Question64: Which is NOT an objective of the Controlling a Stage process?
Question65: Which product defines how the project board should approve the management products produced during the
'initiating a project' process?
Question66: Which is the Change Authority role permitted to authorize?
Question67: Identify the missing words in the following sentence.
A problem/concern, a request for change and [ ? ] are the three types of issue.
Question68: Which is an assumption about the PRINCE2 customer/supplier environment?
Question69: What may be funded from a risk budget?
Question70: Which describes risk probability?
Question71: Which is a task of product-based planning?
Question72: Which is a purpose of the 'controlling a stage' process?
Question73: Which is a purpose of the Directing a Project process?
Question74: What process provides the information required to decide whether to authorize the delivery of a project?
Question75: Which product describes the roles and responsibilities for achieving the effective management of anticipated threats and opportunities in a project?
Question76: What is an advantage of dividing the project into stages?
Question77: Why is the 'initiating a project' process used?
Question78: Which document should record the agreed amount of risk budget for a project?
Question79: Which is an objective of the 'managing a product delivery' process?
Question80: Which is a benefit of using PRINCE2?
Question81: Which is NOT represented by one of the three primary categories of stakeholder identified in PRINCE2?
Question82: Which activity takes place within the Managing a Stage Boundary process?
Question83: In which product does a Project Manager define the time and cost tolerances for the work to be done by a Team Manager?
Question84: Which theme verifies that a project's products are fit for purpose?
Question85: Identify the missing word in the following sentence.
The PRINCE2 method addresses project management with four integrated elements: principles, themes, [ ? ] and tailoring PRINCE2 to the project environment.
Question86: Which role is responsible for appointing the senior user in a project that is independent from a program?
Question87: Which activity takes place within the Managing a Stage Boundary process?
Question88: Which does the Executive need to ensure is in place before the project is initiated?
Question89: Which is a purpose of the plans theme?
Question90: Which is a benefit of applying the 'tailor to suit the project' principle?
Question91: Which is a benefit of using PRINCE2?
Question92: What must be produced to meet the minimum requirements when applying the change theme?
Question93: Which is a responsibility of a risk owner?
Question94: Why is the Initiating a Project process used?
Question95: Identify the missing words in the following sentence.
A benefit of adopting PRINCE2 is that it can be applied to [ ? ] - and can easily be implemented alongside specialist techniques.
Question96: Which product documents the information needed to demonstrate continued business justification?
Question97: According to the 'continued business justification' principle, when is a justifiable reason for a project FIRST needed?
Question98: Identify the missing product in the following sentence.
When assessing an issue during the Controlling a Stage process, the [ ? ] provides essential information to evaluate the viability of the project.
Question99: Why is the 'learn from experience' principle applied to a project?
Question100: What must be produced to meet the minimum requirements when applying the change theme?
Question101: Which describes risk impact?
Question102: Identify the missing words in the following sentence. A risk budget is a sum of money included in the [ ? ] and set aside to fund specific management responses to a project's threats and opportunities.
Question103: Why does PRINCE2 recommend three different levels of plans?
Question104: Which is a purpose of a quality register?
Question105: Identify the missing words in the following sentence. An objective of the Directing a Project process is to [?] throughout a project's life,
Question106: Which is NOT considered when defining risk tolerance?
Question107: Which is shown in a product breakdown structure?
Question108: Which is an objective of the Directing a Project process?
Question109: Which should be provided by a project mandate?
Question110: How many tasks does the product-based planning technique describe?
Question111: Which is NOT a purpose of the Initiating a Project process?
Question112: Which is assumed to be a customer's responsibility in the PRINCE2 customer/supplier environment?
Question113: What is established during the 'initiating a project' process?
Question114: Which characteristic of a project reflects that there are different perspectives and motivations for customers and suppliers?
Question115: Why can PRINCE2 be applied to any type of project?
Question116: Which should be used to document any uncompleted work that needs to be done to a project product after the project has closed?
Question117: Which are advantages of a clear end to a project?
1. No further costs will be incurred by the project
2. Project products will be transferred to operations and support
3. All benefits will have been achieved
4. The project brief will be re-baselined
Question118: Which is a purpose of a project brief?
Question119: Which is a minimum requirement for applying the change theme?
Question120: Why is a Project Brief produced?
Question121: Identify the missing words in the following sentence. A project is [ ? ] organization that is created for the purpose of delivering business products.
Question122: Which process is triggered towards the end of the final stage when all the assigned work has been completed?
Question123: Which of the following take place before the initiation of a project?
1.Appoint the Executive
2.Capture requirements
3.Develop the Project Brief
4.Develop the detailed Business Case
Question124: Which is an objective of the Managing Product Delivery process?
Question125: Which process provides information for the project board to review a completed stage and confirm continued business justification?
Question126: How does the use of product descriptions support the 'focus on products' principle?
Question127: Which of the following is NOT part of quality planning?
Question128: Which statement defines a risk?
Question129: Which should be funded by a change budget?
Question130: Which does the Executive need to ensure is in place before the project is initiated?
Question131: Which is a purpose of the plans theme?
Question132: Which is part of quality control?
Question133: What action is taken as part of the 'controlling a stage' process?
1. Create an exception plan
2. Authorize work to be done
3. Take corrective action
4. Obtain approvals for completed products
Question134: Identify the missing words in the following sentence. A purpose of the Plans theme is to [ ? ] the project's plans.
Question135: Which is a task of product-based planning?
Question136: When should the Project Board refer to corporate or programme management for a decision?
Question137: Which is a benefit of using PRINCE2?
Question138: Identify the missing word in the following sentence. The purpose of the [?] theme is to identify, assess and control uncertainty.
Question139: What product is used to maintain a record of those who have an interest in the project and their information requirements?
Question140: Which are reasons for a benefits management approach?
1. To state how improvements will be measured
2. To confirm that the benefits are realized
3. To estimate the costs of improvement
4. To define the reason for delivering the improvement
Question141: Which is an objective of the Initiating a Project process?
Question142: Who is responsible for documenting any tailoring of the business case theme?
Question143: If an informal issue is defined as a problem or concern, where should it first be recorded?
Question144: Identify the missing word in the following sentence, A purpose of the [?] theme is to control any unacceptable deviations from the project's objectives.
Question145: Which is an objective of the 'initiating a project' process?
Question146: Which statement about risks is FALSE?
Question147: Who should use the information in a Lessons Report to refine, change and improve the standards within a quality management system?
Question148: Which is a purpose of the 'identify the risks' step within the recommended risk management procedure?
Question149: Which statement about applying the 'tailor to suit the project' principle is CORRECT?
Question150: Identify the missing word in the following sentence. The guiding obligations and good practices which determine whether the project is genuinely being managed using PRINCE2 form the [ ? ] of the method.
Question151: Which role represents the stakeholders who will operate the project's products after the project is complete?
Question152: Which aspect of project performance must be managed to ensure the project's products are fit for purpose?
Question153: Which is the first task of PRINCE2's recommended approach to 'defining and analyzing the products'?
Question154: In a commercial environment, which process links the team manager and the PRINCE2 method used in a project?
Question155: Which is an objective of the Starting up a Project process?
Question156: Which does NOT reflect the PRINCE2 principle of continued business justification?
Question157: What theme provides the justification for the project?
Question158: Why is it crucial that the Project Product Description clearly defines acceptance methods?
Question159: Which PRINCE2 principle is supported by the setting of tolerances for the three levels of plan?
Question160: How does the project plan help to support the 'manage by stages' principle?
Question161: Identify the missing word(s) in the following sentence. PRINCE2 recommends three levels of [ ? ] to reflect the needs of the different levels of management involved in a project.
Question162: Which is a purpose of the Risk theme?
Question163: Which is a step in the recommended approach to 'defining and analyzing the products'?
Question164: Which is a minimum requirement for applying the quality theme?
Question165: What plan is created, and submitted for approval, during the Managing a Stage Boundary process?
Question166: Identify the missing words in the following sentence.
The six aspects of project performance to be managed are [ ? ] costs, timescales and scope.
Question167: Where should decisions regarding the tailoring of the project be recorded?
Question168: Which level of management sets the project level tolerances?
Question169: How does the project board use the 'manage by stages' principle to control the project?
Question170: Identify the missing words in the following sentence. The role of [ ? ] is responsible for carrying out a risk response action to respond to a particular risk.
Question171: Which is a type of issue?
Question172: Which document should record the agreed amount of risk budget for a project?
Question173: Which role is responsible for the management of a risk assigned to it?
Question174: Identify the missing words in the following sentence. The role of [ ? ] is responsible for carrying out a risk response action to respond to a particular risk.
Question175: Where should the names of those who are to approve a product be recorded?
Question176: What is the definition of a project outcome?
Question177: Which is a recommended quality review team role?
Question178: Which is a purpose of the quality theme?
Question179: What is the result of the change derived from using the project's product?
Question180: Which is NOT a purpose of the Initiating a Project process?
Question181: In what product should the quality criteria for a specialist product be recorded?
Question182: Which is a purpose of the plans theme?
Question183: Which is a purpose of the business case theme?
Question184: Which is a purpose of an Issue Report?
Question185: Which product is NOT created in the Managing a Stage Boundary process?
Question186: Which is a minimum requirement for applying the quality theme?
Question187: How many tasks does the product-based planning technique describe?
Question188: Which product identifies how often stakeholders require information?
Question189: Which risk response type is appropriate to respond to an opportunity?
Question190: What theme provides all management levels within the project management team with mechanisms for monitoring and control?
Question191: Which is a purpose of the Controlling a Stage process?
Question192: Which statement is CORRECT about the customer and suppliers of a project in a commercial environment?
Question193: Which is a typical core activity within configuration management?
Question194: Which risk response type is appropriate to respond to an opportunity?
Question195: Which is a purpose of the plans theme?
Question196: Which are benefits of using PRINCE2?
1. It removes the need for activity-based planning
2. It promotes learning and continuous improvement
3. It can be applied to any type of project
4. It defines specific leadership and other interpersonal skills required
Question197: Where can people who join a project after initiation quickly and easily find information about how the project is being managed?
Question198: What should influence the Project Board's decision whether to delegate its Project
Assurance responsibilities?
Question199: Which is a minimum requirement for applying the change theme?
Question200: Which characteristic distinguishes a project from regular business operations?
Question201: How is the tailoring approach defined for a project?
Question202: Which is a purpose of the 'controlling a stage' process?
Question203: Which process is used to define how baselines will be established and controlled?
Question204: Which is a purpose of the Directing a Project process?
Question205: Which is NOT obtained from a product's Product Description?
Question206: Identify the missing words in the following sentence. A purpose of the Plans theme is to [ ? ] the project's plans.
Question207: During the 'initiating a project' process, who specifies the required level of management control?
Question208: Which is one of the three levels of plan in PRINCE2?
Question209: What is the first task of product-based planning?
Question210: Which is an objective of the 'directing a project' process?
Question211: Identify the missing word(s) in the following sentence. During a quality review meeting [ ? ] any identified defects.
Question212: Which is an objective of the Starting up a Project process?
Question213: Which is a purpose of a Risk Register?
Question214: Which may be funded from a risk budget?
Question215: What process aims to ensure accurate progress information is provided to the Project Manager?
Question216: Which of the following statements about customer's quality expectations and acceptance criteria are true?
1. Customer's quality expectations form a specific and precise list of measurable criteria that a project product should meet in order to be acceptable to key stakeholders.
2. Acceptance criteria are often expressed in broad terms as a means to gain common understanding of general quality requirements.
Question217: Which of the following statements about quality assurance and Project Assurance is true?
Question218: Which should be funded from a change budget?
Question219: Which should be funded by a change budget?
Question220: Who represents the three project interests on a project?
Question221: Which process is triggered towards the end of the final stage when all the assigned work has been completed?
Question222: Which does the Executive need to ensure is in place before the project is initiated?
Question223: Which step in the issue and change control procedure considers alternative options for responding to an issue that is being managed formally?
Question224: Which approach must be followed as a minimum requirement for applying the plans theme?
Question225: Which are advantages of a clear end to a project?
1. No further costs will be incurred by the project
2. Project products will be transferred to operations and support
3. All benefits will have been achieved
4. The project brief will be re-baselined
Question226: Which is a purpose of the Risk theme?
Question227: When should the level of tailoring be defined?
Question228: How does the use of product descriptions support the 'focus on products' principle?
Question229: Which theme provides the controls to escalate any forecast beyond tolerance to the next management level?
Question230: Which theme provides all management levels within the project management team with mechanisms for monitoring and control?
Question231: Which PRINCE2 integrated element includes the good practices which determine whether a project is genuinely being managed using PRINCE2?
Question232: Which should be funded from a change budget?
Question233: Why would the Project Manager escalate an issue to the Project Board?
Question234: Identify the missing words in the following sentence.
The 'managing a stage boundary' process should be executed [ ? ] a management stage.
Question235: Which is a minimum requirement for applying the quality theme?
Question236: Who should use the information in a Lessons Report to refine, change and improve the standards within a quality management system?
Question237: Which theme verifies that a project's products are fit for purpose?
Question238: Identify the missing words in the following sentence.
The project manager [ ? ] for day-to-day management of the project.
Question239: Identify the missing words in the following sentence. A project is [ ? ] organization that is created for the purpose of delivering business products.
Question240: Which describes an off-specification?
Question241: Which are benefits of using PRINCE2?
1. It removes the need for activity-based planning
2. It promotes learning and continuous improvement
3. It can be applied to any type of project
4. It defines specific leadership and other interpersonal skills required
Question242: Which statement about stages is true?
Question243: Identify the missing words in the following sentence. A Change Authority may be given a [?] to enable it to finance new requirements.
Question244: Which is a purpose of the change theme?
Question245: Identify the missing word in the following sentence.
A project's [ ? ] are the measurable improvements resulting from the outcomes achieved through the use of the project's outputs.
Question246: Which process provides the Project Board with the information it requires in order to commit
resources to the project?
Question247: What do acceptance criteria identify?
Question248: Which should be funded by a change budget?
Question249: What is the first task of product-based planning?
Question250: Which is a true statement about management stages and technical stages?
Question251: Which describes risk probability?
Question252: Which is a purpose of a Configuration Management Strategy?
Question253: What is an advantage of dividing the project into stages?
Question254: Which PRINCE2 principle helps to address a concern that the project team may NOT have worked on a similar project?
Question255: Which process is used to define how baselines will be established and controlled?
Question256: How does the 'managing product delivery' process ensure that the team manager's perspective is provided in a work package?
Question257: Which is a purpose of the Controlling a Stage process?
Question258: What product would enable the Project Manager to review how a Work Package is performing against its cost tolerance?
Question259: What is performed as part of the recommended risk management procedure?
Question260: In which product does a Project Manager define the time and cost tolerances for the work to be done by a Team Manager?
Question261: Identify the missing word(s) in the following sentence. The Quality theme provides a set of rules and procedures which ensure that the [ ? ] created meet(s) the needs of the business.
Question262: Which product summarizes progress and is used to decide whether to amend the project scope or stop the project?
Question263: Which is a true statement about time-driven controls?
Question264: Which process ensures focus on the delivery of a stage's products and avoids uncontrolled change?
Question265: Which is a valid statement about the Project Support role?
Question266: What is used to identify any organization or interested party who needs to be informed of project closure?
Question267: Which is a type of issue?
Question268: Which is one of the three levels of plan in PRINCE2?
Question269: Which are purposes of the quality theme?
1. To implement continuous improvement during the project
2. To establish how the project will ensure that products created will be acceptable to key stakeholders
3. To ensure that the project is desirable and achievable
4. To identify, assess and control uncertainty
Question270: What should be considered when defining the number of management stages in a project?
Question271: Who is responsible for documenting any tailoring of the business case theme?
Question272: Which statements about quality assurance and project assurance are CORRECT?
1. They are both independent of the project manager
2. They are both the responsibility of the project board
3. They are both independent from the project management team
4. They both assure that applicable standards are being used
Question273: Who represents the three project interests on a project?
Question274: Identify the missing words in the following sentence.
The role of [ ? ] is assigned to the project manager if it is not allocated to another person.
Question275: What information should be recorded in the quality register?
Question276: What is a purpose of a Benefits Review Plan?
Question277: Which describes a risk effect?
Question278: What is the project manager role responsible for?
Question279: Which is NOT a true statement about the Managing a Stage Boundary process?
Question280: Where should a Team Manager look for information on the quality required for a product?
Question281: According to PRINCE2, which characteristic is necessary for an effective project board?
Question282: Identify the missing word in the following sentence.
[ ? ] is the measurable decline resulting from a negative outcome.
Question283: What needs to be in place to ensure effective issue and change control?
Question284: Who carries out audits that are independent of the project?
Question285: Which process is used to define how baselines will be established and controlled?
Question286: Which is a purpose of the 'initiating a project' process?
Question287: Identify the missing word(s) in the following sentence. PRINCE2 recommends three levels of [ ? ] to reflect the needs of the different levels of management involved in a project.
Question288: Which is a purpose of an End Project Report?
Question289: Which is a purpose of an End Stage Report?
Question290: Which is a purpose of the Plans theme?
Question291: Which is part of the PRINCE2 definition of a project?
Question292: Which statement about the quality review technique is FALSE?
Question293: Why is the 'learn from experience' principle applied to a project?
Question294: Which is a purpose of quality planning?
Question295: How many management stages should a PRINCE2 project consist of?
Question296: Which provides a single source of reference that may be used by people joining a project after it has been initiated so they can quickly and easily find out how the project is being managed?
Question297: Which product defines how the project board should approve the management products produced during the 'initiating a project' process?
Question298: Which is created during the Starting up a Project process?
Question299: Which product is created in the 'starting up a project' process to define and confirm the scope of the project?
Question300: Which is a minimum requirement for applying the organization theme?
Question301: Identify the missing word in the following sentence.
A project's [ ? ] are the measurable improvements resulting from the outcomes achieved through the use of the project's outputs.
Question302: Which task is performed by the Change Authority?
Question303: Which describes the 'Identify Risks' step within the recommended risk management procedure?
Question304: Which of the following refers to the actions identified to bring a situation to a level where exposure to a risk is acceptable?
Question305: According to the 'defined roles and responsibilities' principle, how many categories of stakeholder interest need to be represented in the project management team?
Question306: Which is a purpose of a Project Product Description?
Question307: Which is a typical core activity within configuration management?
Question308: Which approach must be followed as a minimum requirement for applying the plans theme?
Question309: Identify the missing words in the following sentence.
Project assurance personnel [ ? ] the project manager.
Question310: Which is a purpose of a Project Brief?
Question311: What information about benefits management must be documented to meet the minimum requirements for applying the business case theme?
Question312: Identify the missing words in the following sentence.
When proposed changes [ ? ], the change authority must refer the decision back to the project board.
Question313: Which is a recommended quality review team role?
Question314: When should the Project Board refer to corporate or programme management for a decision?
Question315: What is described as an organization's unique attitude towards risk taking
Question316: Which is a purpose of the Starting up a Project process?
Question317: What product records any time tolerances agreed between the Project Manager and Team
Manager?
Question318: Which is part of quality control?
Question319: Which step in the issue and change control procedure considers alternative options for responding to an issue that is being managed formally?
Question320: Which is a purpose of a lessons log?
Question321: Identify the missing word in the following sentence. The guiding obligations and good practices which determine whether the project is genuinely being managed using PRINCE2 form the [ ? ] of the method.
Question322: Which product records any project outcomes perceived as negative by stakeholders?
Question323: According to the 'defined roles and responsibilities' principle, what must be represented in the project management team?
Question324: Which is a purpose of the change theme?
Question325: What may be funded from a risk budget?
Question326: Who should act as the communication channel between a project and corporate or programme management?
Question327: Which describes a characteristic of a project?
Question328: Which is an objective of the 'initiating a project' process?
Question329: What needs to be in place to ensure effective issue and change control?
Question330: What needs to be in place to ensure effective issue and change control?
Question331: How does the 'managing product delivery' process achieve its purpose?
Question332: What should the 'managing product delivery' process ensure?
1. That the planned products meet their quality criteria
2. That the stage plan is kept up to date
3. That the project board is provided with progress information
4. That the planned products are delivered within tolerance
Question333: Which risk response type is appropriate to respond to an opportunity?
Question334: Which regular report provides the Project Board with a summary of stage status?
Question335: Which is NOT a purpose of a Benefits Review Plan?
Question336: Which are advantages of a clear end to a project?
1. No further costs will be incurred by the project
2. Project products will be transferred to operations and support
3. All benefits will have been achieved
4. The project brief will be re-baselined
Question337: Which is a typical core activity within configuration management?
Question338: Which is a minimum requirement for applying the risk theme?
Question339: Which is a purpose of the 'closing a project' process?
Question340: Why is the Initiating a Project process used?
Question341: Which is a minimum requirement for applying the change theme?
Question342: What is a supplier of a PRINCE2 project responsible for?